Lab #4, Installation in the Outside Plant

Section I: Use a reference such as the IRWA (www.irwaonline.org) to answer the question below. Cite your reference. (citation is worth 2 points)

1. What is a right-of-way? (4 points)

Full Definition of RIGHT-OF-WAY
1
:  a legal right of passage over another person's ground
2
a :  the area over which a right-of-way exists
b :  the strip of land over which is built a public road
c :  the land occupied by a railroad especially for its main line d :  the land used by a public utility (as for a transmission line)

http://www.merriam-webster.com/dictionary/right-of-way

Section II: Using the RIGHT OF WAY Manual for the city of Burleson,Texas available in doc sharing and from the Week 4 iLab page, answer the questions below. (Each question is worth 3 points, section of the manual is worth 2 points)

1. May we dig a trench across the city street shown in this lab? (3 points) What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)

Yes, Section 3.3 and 3.6

2. Who issues the permit for this work? Is this a local or state agency? (3 points) What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)

Department of Engineering Services, Section 3.2

3. Must we submit construction plans to the city? If so, how many and to what entity are they submitted? (3 points) What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)

Yes plans must be submitted to the department of engineering. Sections 3.2 and 3.3

4. Once the permit is issued, how long must we wait before commencing work? How long do you have MAXIMUM to start work? (3 points) What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)

Once a construction permit is issued, permittee shall give the Department of Engineering Services a minimum notice of 48 hours prior to commencing work so that a City of Burleson inspector may be assigned. (Section 4) Construction must begin no later than 90 days after permit is issued by the department of engineering services, unless otherwise extended (Section 3.2).
5. How deep must any cables be buried? (3 points)
What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)

If there is a potential conflict, the location of the city’s fiber optic cables and communication lines. The applicant should contact the Information Services Department at (817) 447-5400 ex 293.

6. What are the exact detailed compaction requirements as listed in the manual provided by the city for restoration of any surface that is trenched? When do compaction of trenches have to occur? What are the backfill to be made of? (3 points) What section/sections in the ROW manual for the city of Burleson, Texas are relevant for this question? (2 points)

(Section 4.4 C) and (Section 4.5)

Trenches excavated to facilitate operation shall be backfilled and compacted immediately after work is completed, or the bore pits or trenches shall be secured adequately to protect the public. Unless appropriate measures are taken to protect the public from open trenches or bore pits., backfill of all trenches and bore it’s within the right of way shall begin immediately following installation of the new facility in accordance with the attached detailed and the following requirements. (Appropriate measures include barricades, construction fencing or steel plates, or alternate protections, as approved by the Director).

1. All loose concrete, rocks, roots, trash and other debris shall be removed from the excavation prior to any backfill being placed. 2. Backfill material shall consist of the native material obtained from the street excavation...
Continue Reading

Please join StudyMode to read the full document

You May Also Find These Documents Helpful

  • Essay about netw310 week 4 ilab
  • Essay about Week 4 iLab Report
  • Week 4 Ilab Essay
  • Week 4 Ilab Essay
  • Sec 572 Week 4 Ilab Essay
  • Netw 360 iLab Week 4 Essay
  • Essay on Stat 221 week 6 ilab
  • Netw320 week 4 ilab Essay

Become a StudyMode Member

Sign Up - It's Free